Project Description
topographic survey and technical assistance for water catchment project application at over 1100 meters altitude which includes a breakthrough. The water is brought on the production platforms through stainless steel pipes over a distance of 28 kilometers (connecting the localities of Stana de Vale and Sudrigiu)